    彩钢板屋面渗漏的施工步骤!
    来源:贵州快3http://www.wasolo.com  2019-08-27 10:46:23

      彩钢厂家介绍彩钢屋面渗漏施工步骤如下:

      The construction steps of color steel roof leakage are as follows:

    贵州快3  确定需要防水的地方:

      Identify waterproof areas:

    贵州快3  金属屋面通常有以下防水区域:水平搭接、垂直搭接、通风机口、伸缩屋面管、空调管、四周采光板、屋脊排水沟、金属板与子墙接头、螺丝固件等金属屋面防水薄弱环节。

      Metal roofs usually have the following waterproof areas: horizontal overlap, vertical overlap, ventilator openings, telescopic roof pipes, air conditioning pipes, surrounding lighting panels, roof drainage ditches, metal plate and sub-wall joints, screw fasteners and other weak links of metal roof waterproofing.

    贵州快3  彩钢屋面渗漏基层预处理:

      Pretreatment of seepage base of color steel roof:

      施工前仔细检查金属屋面,确保其坚固。清洁、不生锈、不结冻。不符合上述条件的,分别进行以下处理:

      Check metal roof carefully before construction to ensure its firmness. Clean, rust-free and freeze-free. Those who do not meet the above conditions shall be treated as follows:

      更换生锈的固件并添加固件。

      Replace rusty firmware and add firmware。

      B.用防锈砂纸将锈斑处擦拭干净,直到锈斑处出现金属色,然后涂上底漆。

      B。 Use rust-proof sandpaper to wipe away the rust spots until they appear metallic and then coat with primer。

      C.清除霜冻、灰尘和其他污垢。

      C. Remove frost, dust and other dirt.

      彩钢生产厂家简要介绍了彩钢屋面渗漏施工工艺:金属屋面搭接接头先涂上底漆。当它还是湿的时候,将15-20cm宽的车缝涤纶布插入其中,然后将车缝的涤纶布完全浸湿,并在上面涂上基材。即使是干。

    20121114135458975897.jpg

      The color steel manufacturer briefly introduces the construction technology of color steel roof leakage: the metal roof lap joint is coated with primer first。 When it is still wet, insert the sewn polyester cloth 15-20 cm wide into it, then soak the sewn polyester cloth completely and coat it with base material。 Even if it's dry。

      B,金属屋顶突出(如烟囱、通风口、粉丝等):切割、适当的聚酯织物的大小,根据技术要求切割,突起周围涂上底漆,剪一个编织聚酯布在上面,缝纫润湿与底漆涤纶布,全面确保没有气泡,皱纹是免费的。

      B, metal roof protruding (such as chimneys, vents, fans, etc.): cut, appropriate size of polyester fabric, according to technical requirements, cut, primer around protrusion, cut a knitted polyester cloth on it, sew wet and primer polyester cloth, fully ensure that there are no bubbles, wrinkles are free.

      C.金属屋面固件:涤纶织物以10cm×10cm编织而成,按上述方法处理。

    贵州快3  C. Metal roofing firmware: Polyester fabrics are knitted in 10 cm x 10 cm and treated in accordance with the above methods.

      D.金属屋面排水管:排水管搭接接头、出水口等。首先采用金属屋面防水系统进行局部防水处理,然后在较大的防水区域涂上一层涂料,当接缝潮湿时进行伸缩。酯布,然后从上面湿润聚酯布,使其完全干燥

      D。 Metal roof drainage pipe: drainage pipe lap joint, outlet, etc。 First, the metal roof waterproofing system is used for local waterproofing treatment, and then a coat of paint is applied to the larger waterproofing area to expand when the joint is wet。 Ester cloth, then wet the polyester cloth from above to make it completely dry。

      至少12小时后,涂上最后一层防水霜。

      At least 12 hours later, apply the last layer of waterproof cream。

      E。在防水区域涂一层或两层防水涂料,并根据不同的颜色进行调整。

      E. Apply one or two layers of waterproof paint to the waterproof area and adjust it according to different colors.